Wind turbine blade manufacturer, LM Wind Power have increased capacity in its US manufacturing base, adding more than 850 jobs...
Vestas has announced that further development of a new facility at the Port of Sheerness in the south-east of England...
Blade Dynamics has announced that the design phase of their ‘Very Long Blade Project’ for the Energy Technologies Institute (ETI)...
3A Composites Core Materials and the Dow Chemical have entered into a strategic cooperation to market innovative core material solutions...
The inventors at Festo have developed an extraordinary technology platform that uses two pairs of horizontally arranged carbon fibre wings...
The new positions have been created in order to fulfil the demand for DONG Energy’s 258 MW Burbo Bank Extension...







